| Authoras | Paper Title | Paper Code |
|---|---|---|
|
Eng. ASHRAF B. GIRGIS Dr. MAGED E. GEORGY Dr. AZZA M. KAMEL |
SYNOPSIS OF FEASIBILITY STUDY PROCEDURES IN EGYPT: CASE OF PUBLIC CONSTRUCTION PROJECTS |
|
|
Dr. Mohamed M. Askar Dr. Ahmed A. Gab-Allah |
IMPACT OF ISO-CERTIFICATION ON PERFORMANCE INDICATORS OF CONSTRUCTION COMPANIES |
|
|
Dr. Mohamed M. Askar |
LABOR MARKET DEMAND SURVEY IN THE EGYPTIAN CONSTRUCTION INDUSTRY |
|
|
Dr. MAGED E. GEORGY Eng. SAMEH Y. BASILY |
A GENETIC ALGORITHMS METHOD FOR RESOURCE LEVELING UNDER LINE OF BALANCE TECHNIQUE |
|
|
Dr. Mohammad A. Ammar |
RESOURCE OPTIMIZATION IN LOB SCHEDULING |
|
|
Eng. MOHAMED A. ABDEL-GAWAD Dr. MAGED E. GEORGY Prof. Dr. MOHEEB E. IBRAHIM
|
SOURCES OF PROJECT RISKS UNDER JOINT VENTURES IN EGYPT |
|
|
Dr. Osama E K Daoud |
Evaluating Quality Control of Tender Documents from Bid Queries |
|
|
Dr. Mohamed Marzouk Eng. Mohamed Moemen |
SIMPLIFIED SPREADSHEET APPLICATION FOR COST ESTIMATION OF SEWER SYSTEMS |
|
|
Dr. Mohammad A. Ammar Dr. Fayez A. Jarad |
An Effective CPM-Based Approach for Delay Analysis |
|
|
DR. MAGED E. GEORGY DR. SAMEH H. BARSOUM |
NEURAL NETWORKS SYSTEM FOR BUDGET ESTIMATING OF SCHOOL CONSTRUCTION PROJECTS- A SPREADSHEET |
|
|
Dr. EMAD ELBELTAGI |
USING ANT COLONY OPTIMIZATION FOR TIME-COST TRADE-OFF IN CONSTRUCTION |
|
|
Prof. Dr. M. SHEHATA Dr. S. HAFEZ Dr. A. EL- LAKANY Eng. Y. ABO EL-MAGD |
MATHEMATICAL MODEL FOR DETECTION OF A SINGLE TOWER CRANE LOCATION |
|
|
Prof. Dr. RAFAAT ABDEL –RAZEK Dr. DR. MOHEEB EL SAID Eng. MAHMOUD HAMMAM |
MEASURING THE EXECUTION QUALITY OF THE SUEZ CANAL BRIDGE |
|
|
Prof. Dr. Ali Sherif Dr. Mohamed Ahmed El-Mikawi Eng. Mohamed Badawy Abd EL-Megeed |
Critical Success Factors for “B.O.T.” Projects in Egypt |
|
|
Prof. Dr. ABD El HADY HOSNY1 Dr. MOHAMED A. EL-MEKAWI Eng. AHMED SAMIR MATAR |
DEVELOPING COST CONTROL SYSTEM FOR TUNNEL PROJECTS
|
|
|
Dr. Ibrahim Abdul Rashid Eng. Basem Bakarman |
Risk Assessment and Analysis for Construction Contractors in Egypt |
|
|
Dr. Ibrahim A. Nossair Dr. Ahmed A. Gab-Allah Eng. Mohamed A. Tantawy |
A COMPUTER AIDED METHODOLOGY FOR CONTRACTOR SELECTION IN CONSTRUCTION PROJECTS |
|
|
Prof. Dr. AHMED ELNEMR Dr. IBRAHIM ABD EL-RASHEED Dr. SHABAAN SELIM Eng. MOSTAFA MOAWAD |
DETERMINATION OF THE PROJECT CHARACTERISTICS WEIGHT EFFECT ON THE OCCURRENCE OF CLAIMS AND DIS-PUTES |
|
|
Prof. Dr. AHMED ELNEMR Dr. IBRAHIM ABD EL-RASHEED Dr. SHABAAN SELIM Eng. MOSTAFA MOAWAD |
FRAMEWORK TO MINIMIZE CONSTRUCTION CLAIMS AND DISPUTES |
|
|
Dr. Mostafa Abbas Mostafa Eng. Ahmad Al-Sa'eed A. Abdel-aal |
RELATIONSHIP BETWEEN THE QUALITY OF WORK AND PROFITABILITY OF CONTRACTING COMPANIES IN EGYPT |
|
|
Prof. Dr. AMR EZZAT SALAMA Prof. Dr. GOUDA GHANEM Dr. OSAMA HOSNY Eng. HUSSEIN ABDEL MAKSOUD |
IT APPLICATION FOR INTEGRATING DESIGN, QUANTITY SURVEYING, AND COST ESTIMATION FOR RC STRUCTURES |
|
|
Prof. Dr. Abdel Hady Hosny Dr. Mohamed El- Mikawi Eng. Viviane Ayoub Matta |
Financial Difficulties in Large Governmental Construction Projects |
|
|
Dr. MAGED E. GEORGY Prof. Dr. MOHEEB E. IBRAHIM Eng. MOHAMED A. HAMMOUDA
|
SIMULATION AS TOOL FOR THE AIR POLLUTION ASSESSMENT OF CONSTRUCTION OPERATIONS
|
|
|
Prof. Dr. ABDEL-HADY HOSNY Dr. FATHY A. SAAD Eng. SAFWAT S. SADEK |
COST MANAGEMENT FOR PRECAST CONCRETE PIPES : MODELING AND OPTIMIZATION |