Construction Management

BACK

Paper Code

Title and Author

MAN002

Construction Disputes In Egypt: Causes And Methodologies For Resolution  //\\ MOHAMED MARZOUK - L.T. EL-MESTECKAWI  - M. E. IBRAHIM

MAN003

Modeling Contractor Selection Process Using Superiority And Inferiority Method //\\ MOHAMED MARZOUK

MAN006

A Mathematical Model To Predict The Lowest Bid For Construction Projects In Egypt  //\\ A. M. EL-KHOLY  -  MOHAMMAD A. AMMAR - A. I. EL-DOSOUKY

MAN007

An Automated System For Repairing Defects In Reinforced Concrete Elements //\\ MOHAMED MARZOUK - S. A. ABDEL HAMID  - M. E. IBRAHIM

MAN008

Benchmarking In Construction Using Data Envelopment Analysis //\\ HESHAM BASSIONI

MAN013

Optimization Modelling Of Lob Scheduling Considering Work Interruptions //\\ M. A. AMMAR

MAN014

Risks In Engineering, Procurement, And Construction Contracts With A Case Study //\\ A. H. H. KHALIL - M. A. MOSTAFA  - KHALED AHMED ALI AL-NAAS

MAN015

The Effectiveness Of Service Quality In Meeting Customers Satisfaction In Construction Industry In Egypt
Application On Contractors At Egypt’S North Coast From Kilo 47 To 90

 //\\ HOSSAM-ELDIN ABD-ELAZIM ELSHARKAWY  - DOAA MOHAMED AYOUB

MAN017

Contemporary Status And Perception Of Health And Safety In Large Egyptian Contractors //\\ IBRAHIM ABDUL-RASHID - HESHAM AHMED BASSIONI - FAEZ BAWAZEER

 

 

 

BACK